Realisation
| | Matagami Foundation and installation of the covered entrance to the mine
Works of foundation and implementation of the cover entrance of the mine, the works of foundation of the communication tower, the compressors and the electric substation of the mine site.
|
|
| | Matagami
Administrative Building
Complete execution of the conception, the supply, the manufacturing, the delivery on the site and the installation for a modular administration building (“design/built” contract type).
|
|
| | Matagami
Mechanical workshop
Complete execution of the conception, the supply of materials and the erection on the site of a mechanical workshop serving for maintenance of vehicles and equipment (“design/built” contract type). |
|
| | Matagami
Foundations paste backfill plant
To Realize the piled foundations, the foundations of the paste backfill plant, of the surge hopper and of the cement silo. |
|
| | Raglan Wharf Rehabilitation
Construction of a new seaport using the existing infrastructures, including the transportation and the installation of caissons and also the pose of a riprap and a protection mattress.
|
|
| | Chicoutimi
Works of concrete repairing
Repair of concrete stubs of towers.
|
|
| Baie-Comeau Repair of dining rooms, room 67
All the works needed to renovate 24 dining rooms in the Alcoa Baie-Comeau’s aluminun smelter. |
|
| | Iqaluit 8-plex housing in Iqaluit
Construction of a semi-luxuous 8-plex building with view on the sea and on Frobisher Bay |
|
| | Kuujjuaq
The new Kuujjuaq airport terminal project
Construction of a new 1,224 m2, single-storey airport terminal with reception and waiting areas, storage zones and space for management functions. A LEED certified sustainable building is designed and constructed with environmental protection and sustainable construction objectives.
|
|
| | Kuujjuaq
Construction of a new airport terminal
Works including the preparation of the site, all the works needed for the foundations, the insulation, the erection of walls and the installation of windows, the whole executed in a perspective of protecting the environment.
|
|
|