Head office
130, Notre-Dame Ouest,
C.P. 160
Alma (Québec)
Canada, G8B 5V6

Phone : 418-668-3321
Fax : 418-668-0652

Realisation

Key words:

2007- Xstrata Zinc
Final structureMatagami
Foundation and installation of the covered entrance to the mine
Works of foundation and implementation of the cover entrance of the mine, the works of foundation of the communication tower, the compressors and the electric substation of the mine site.

2007 - Xstrata Zinc
completed building OverviewMatagami
Administrative Building
Complete execution of the conception, the supply, the manufacturing, the delivery on the site and the installation for a modular administration building (“design/built” contract type).


2007- Xstrata Zinc
Final result overviewMatagami
Mechanical workshop
Complete execution of the conception, the supply of materials and the erection on the site of a mechanical workshop serving for maintenance of vehicles and equipment (“design/built” contract type).

2007 - Xstrata Zinc
Final resultMatagami
Foundations paste backfill plant
To Realize the piled foundations, the foundations of the paste backfill plant, of the surge hopper and of the cement silo.

2007-Xstrata Nickel
The new wharfRaglan
Wharf Rehabilitation

Construction of a new seaport using the existing infrastructures, including the transportation and the installation of caissons and also the pose of a riprap and a protection mattress.

2007 - Hydro-Quebec
New stub of towerChicoutimi
Works of concrete repairing

Repair of
concrete stubs of towers.

2007 - Alcoa Ltd.
Baie-Comeau
Repair of dining rooms, room 67
All the works needed to renovate 24 dining rooms in the Alcoa Baie-Comeau’s aluminun smelter.

2006 - Almiq Contracting Ltd.
Iqaluit
8-plex housing in Iqaluit
Construction of a semi-luxuous 8-plex building with view on the sea and on Frobisher Bay

2006 - The new airport terminal project
The new Kuujjuaq airport terminalKuujjuaq
The new Kuujjuaq airport terminal project
Construction of a new 1,224 m2, single-storey airport terminal with reception and waiting areas, storage zones and space for management functions. A LEED certified sustainable building is designed and constructed with environmental protection and sustainable construction objectives.

Public Works and Government Services Canada
The airport terminalKuujjuaq
Construction of a new airport terminal
Works including the preparation of the site, all the works needed for the foundations, the insulation, the erection of walls and the installation of windows, the whole executed in a perspective of protecting the environment.




 «  1 2 3 4 5 6 7 8 9 10  »  »| 18